Industrial scale. At this size the conversation stops being about batches per day and becomes scheduling, storage and logistics.
Ex-works price. Excludes freight, installation and gas works. Includes machine, cooling tray, duct adapter, tools and a spare-parts kit.
Every figure from our technical drawing sheet.
Output is nominal; cooling, loading and cleaning take their cut — plan on 60–70%.
Roasting plants with bulk contracts, food processors, ingredient suppliers.
The difference between sizes is throughput and floor space, not build quality.