Every week somebody asks whether they should take the electric version. The answer depends on three facts about your building, your electricity bill and how many batches a day you run.
Gas fires a burner tube inside the drum. Heat arrives partly by radiation from the tube, partly as hot air through the bean mass. Recovery between batches is fast, because you can push the burner hard for two or three minutes and pull it back.
Electric replaces the burner with resistance elements. There is no flue gas, no gas inspection, no annual burner service. Heat-up is slower and, critically, the recovery between batches is slower — the elements have thermal mass and cannot be pushed past their rating.
| Model | Gas motors | Electric option |
|---|---|---|
| HR-6KG | 1.46 kW | 15.8 kW |
| HR-12KG | 2.92 kW | 33 kW |
| HR-15KG | 2.92 kW | 36 kW |
| HR-20KG and up | 4.5–23 kW | not offered |
All electric versions need 380 V three-phase. A 36 kW element load is not something you plug into a wall socket — check the building's capacity with an electrician before you order.
Ask what happens on the day the element fails. A burner can usually be serviced on site; an element bank is a replacement part. Either way you want the spare available, but the lead time is different. Ask both suppliers before you decide.
For a first machine up to 15 kg, in a building without gas, electric is a genuinely good answer. For anything running more than four batches a day, or above 15 kg, gas is the right tool and we will say so even though the electric version is the easier sale.
Send us daily volume, site and gas type, and we come back with a model and a price.